Refused planning and appeals in Enfield Lock
Landowners in Enfield Lock are often surprised by how much planning consent can change the value of a field, paddock or plot. A planning appeal asks an independent inspector or reporter to review a council's refusal or non-determination of a planning application.
What makes land near Enfield Lock attractive to builders?
With roughly 16,500 residents and Archway around 8 miles away, Enfield Lock is the kind of settlement where planned growth is usually directed to edge-of-town land with safe access.
Which planning system covers Enfield Lock?
In England, the route to consent runs through local plans and the National Planning Policy Framework (NPPF). For land around Enfield Lock, we check the current plan, any emerging review and the five-year housing land supply test.
What does refused land and appeals involve for you?
Where an appeal has a real chance, we can take it on at our cost as part of a promotion or option agreement.
A refusal is not always the end. Many refusals turn on points that can be fixed: layout, access, drainage or a missing report.
What is the planning gain in London?
Values vary site by site, but London land with outline-type consent often sits between £1.6m and £3.2m per net acre. Agricultural value is nearer £12,000 to £20,000 an acre.
What does the process look like?
Every site begins with an honest view. If we think your land has a realistic route, we set out the timescale, costs we will carry and how proceeds are shared. If not, we say so.
To find out where your land stands, send us the postcode and rough size, or try the planning gain calculator for an indicative figure.
Other routes in Enfield Lock
Refused land and appeals nearby
Questions landowners ask
Who decides appeals?
In England the Planning Inspectorate, in Wales PEDW, in Scotland the DPEA and in Northern Ireland the Planning Appeals Commission.
How long would planning take for land around Enfield Lock?
Small sites with a clear policy route can be decided in 6 to 12 months. Land that needs allocation in the local plan usually takes several years.
Is there demand from builders around Enfield Lock?
Demand depends on house prices, sales rates and competing sites. Near Enfield Lock, buyers look at access, local services and the distance to Archway. We test it with builders before advising.